VICKERS type hydraulic pump 20V-11A-1D-22R, 20V-11A-1C-22R installation instructions and technical parameters

2025-02-15

1. Product Overview

VICKERS hydraulic pumps 20V-11A-1D-22R and 20V-11A-1C-22R are two high-performance single vane pumps with compact structure, easy maintenance, high efficiency and stability. These two vane hydraulic pumps are widely used in petroleum, chemical, electric power, metallurgy and other industrial fields, and are important components for achieving efficient operation of hydraulic systems.

2. Technical Parameters

①VICKERS type 20V-11A-1D-22R vane oil pump technical parameters:

Model: 20V-11A-1D-22R

Weight: 12 kg

Shaft extension: Key

Drive mode: Electric

Geometric displacement: 35.0 cm³/r

Maximum speed: 1800 r/min

Minimum speed: 600 r/min

Maximum operating pressure: 207 bar

Oil outlet position: 90° clockwise from the oil inlet (viewed from the cover end of the pump)

②VICKERS type 20V-11A-1C-22R vane oil pump technical parameters:

Model: 20V-11A-1C-22R

Weight: 12 kg

Shaft extension: Flat key

Drive mode: Electric

Geometric displacement: 35.0 cm³/r

Maximum speed: 1800 r/min

Minimum speed: 600 r/min

Maximum operating pressure: 207 bar

Oil outlet position: On the same side as the oil inlet (viewed from the cover end of the pump)

3. Installation Instructions

1. Preparation before installation

Ensure that the installation environment is dry, clean, and free of oil and impurities.

Check whether the pump body and parts are intact and free of damage and cracks.

Prepare necessary installation tools and materials, such as bolts, nuts, gaskets, etc.

2. Installation steps

Positioning: Place the hydraulic pump in the predetermined installation position, ensure that the pump shaft is horizontal and the inlet and outlet directions are consistent with the pipeline layout.

Connection: Use bolts and nuts to firmly connect the hydraulic pump to pipes, motors and other components. Pay attention to check the sealing of the connection to prevent leakage.

Debugging: After installation, carry out debugging. Start the motor and check whether the pump rotates in the correct direction and whether there are any abnormal sounds and vibrations.

Inspection: During the commissioning process, check the oil temperature and pressure of the pump to ensure that they are within the normal range. If any abnormality is found, stop the pump immediately for inspection.

3. Notes

During the installation process, relevant safety operating procedures should be followed to ensure personal and equipment safety.

The pump body and its parts should be handled with care during installation and disassembly to avoid damage.

When replacing pump parts, use parts of the same specification and quality as the original ones.


Get the latest price? We'll respond as soon as possible(within 12 hours)