• YiHe Type T6CC-008-005-1R00-C100 High Pressure Double Vane Pump
  • YiHe Type T6CC-008-005-1R00-C100 High Pressure Double Vane Pump
  • YiHe Type T6CC-008-005-1R00-C100 High Pressure Double Vane Pump
  • YiHe Type T6CC-008-005-1R00-C100 High Pressure Double Vane Pump
  • YiHe Type T6CC-008-005-1R00-C100 High Pressure Double Vane Pump

YiHe Type T6CC-008-005-1R00-C100 High Pressure Double Vane Pump

Brand: YiHe

Product origin: China

Delivery time: 10-30day

Supply capacity: 300 Pcs/Day

Model: T6CC-008-005-1R00-C100
Max Displacement: 26.4 ml/rev 17.2ml/rev
Max Working Pressure: 24 Mpa 24 Mpa
Shaft Speed Range: 600-2800 r/min 600-2800 r/min
Rotation: Right and Left From Shaft End
Control Type: DOSING PUMP
Product Type: Vane Pump

YiHe Type T6CC-008-005-1R00-C100 High Pressure Double Vane Pump


double Vane Pump


Product details


Advanced performance, not easy to leak oil

T6CC-008-005-1R00-C100

T6CC series vane pump features:
     1. This type of vane pump can meet very rapid pressure change cycle requirements, and the output flow can maintain precise repeatability;
     2. High working pressure: The pressure of the small-sized casing pump can reach 320bar, which can reduce the installation cost. If used at reduced pressure, the working life can be extended;
     3. High volumetric efficiency: the typical value is higher than 94%, thus reducing heat generation and allowing the rotation speed to be as low as 600rpm under full pressure conditions;
     4. High mechanical efficiency: typical value is higher than 94%, reducing power loss;
     5. Wide speed range (600rpm~3600rpm): Combined with the use of a large-displacement pump core, a smaller-sized housing can be used to form a larger-displacement, low-noise pump;
     6. Low speed (600rpm), low pressure and high viscosity (860cSt) working performance: allows operation under low temperature conditions, with low energy consumption and no risk of stuck;
     7. Small pressure pulsation (±2bar): reduces pipeline noise and extends the service life of other components in the circuit;

Product Parameters

YiHe Type T6CC


Pressure
port
SeriesVolumetric
Displacement Vi
Flow qve [l/min] & n = 1500 RPMInput powerP [kW] & n= 1500 RPM
p= 0 barp= 140 barp= 240 barp= 7 barp= 140 barp= 240 bar 
P101447,6 ml/rev71,462,155,92,318,530,6
01758,2 ml/rev87,378,071,82,522,237,0
02066,0 ml/rev99,089,783,52,824,941,7
02479,5 ml/rev 119,3 110,0103,83,029,649,8
02889,7 ml/rev134,5 125,2119,03,233,255,9
03198,3 m/rev147,4138,1131,93,336,261,0
035111,0 m/rev166,5157,2151,03,540,768,7
038120,3 m/rev180,4171,1164,93,743,974,3
042^2136,0 m/rev204,0194,7188,54,049,483,7
045^2145,7 m/rev218,5209,2203,04,152,889,5
050^2158,0 ml/rev237,0227,7224,0^1)4,457,085,0^1)
P200310,8 ml/rev16,211,27,71,35,38,4
00517,2 ml/rev25,820,817,31,47,512,2
00621,3 ml/rev31,926,923,41,58,914,7
00826,4 ml/rev39,634,631,11,610,717,7
01034,1 ml/rev51,146,142,61,713,422,3
01237,1 ml/rev55,650,647,11,714,424,1
01446,0 ml/rev69,064,060,51,917,629,5
01758,3 ml/rev87,482,478,92,121,936,9
02063,8 ml/rev95,790,787,22,223,840,2
02270,3 ml/rev105,4100,496,92,326,144,1
02579,3 ml/rev118,9113,9110,42,529,249,5
02888,8 ml/rev133,2128,2125,8^1)2,832,748,5^1)
031100,0 ml/rev150,0145,0142,6^1)2,836,554,4^1)


 

 

Instructions for use

To protect your rights please read the following carefully

Pump Start-up Procedure 
Preparation Prior to Start-up 
The reservoir and circuit should be clean and free of dirt and debris prior to filling with fluid. 
Circuit Cleanup 
The reservoir should be charged with filtered hydraulic fluid. The fluid level should be sufficient to prevent vortexing at the suction connection to the pump inlet. It is good practice to clean the system by flushing and filtering, using an external slave pump. 
Filling Pump and Removing Air 
If the pump is mounted above the fluid level, it should be filled with fluid through the outlet port. If the pump is mounted below the fluid level, the pump outlet fitting (or other downstream fitting or plug) can be loosened to allow fluid to displace the air. It may be necessary to loosen the fill cap on the reservoir to allow the fluid to flow freely. When a solid stream of fluid with no observed air begins to drain through the loosened fitting, the fitting should be retightened. An air bleed valve in the outlet circuit is also recommended to remove trapped air. If such a device is used, the pump should be filled with fluid before start-up. In some cases, it may be possible to prime the pump by running the engine starter for five to ten seconds with the throttle and/or ignition switch in the "off" position. It will be necessary to loosen a fitting or plug in the pump outlet to allow air to escape. 
Pump Start-up 
All controls should be placed in the neutral position so the pump is unloaded when started. Start the engine and run at low idle. Once the pump is started, it should prime and pump within a few seconds. If it does not, make sure there are no restrictions between the reservoir and the inlet to the pump, and that there are no air leaks in the inlet line and connections.  Also, make sure that trapped air can escape from the outlet. Run at low engine idle for approximately five minutes. Then, while observing the reservoir fluid level, operate the implements. Extend all actuators to maximum safe limits to completely fill the system with fluid. Do not run with the fluid level below the "low" limit. Add fluid to the reservoir to bring the fluid to the proper fill level.

double Vane Pump

Company Profile

We are Guangzhou Yisheng Machinery Equipment Co.,Ltd., which located in Foshan City, Guangdong Province, China. We have R&D department with about 5-10 engineers and designers. Our factory have over 100 skilled employees, our production facility have many advanced manufacturing equipments and testing equipments, such as numerical control lathe, the processing center, CNC milling machine, special CNC grinding machine, double grinding machine, automatic 3D measuring instrument, etc..


Our main products are hydraulic variable displacement vane pump, double pump, HVP high pressure variable displacement vane pump, PV2R1 & PV2R2 series,V&VQ series,T6&T7 series, SQP series and VQ series of fixed displacement vane pump and electrical motors for hydraulic application.


Our products are widely used for industrial machinery, NC lathe machine, shoe machinery, wood working machines, plastic machines, construction machines and various hydraulic system machinery. We also able to supply the customized products and services as per your spec. ,we are looking forward to cooperating with your company sincerely.

T6CC-008-005-1R00-C100

 

Why choose us

1.The company established more than 10 years, old brand, worthy of trust,Has more than 1000k+ followers

2.The company's product category is complete, also have a variety of accessories to provide.

3.All products have been passed strict quality test before shipment, make sure high quality.

4.24H customer service,Please feel free to contact me if you have any questions.

5.One-year warranty, we have professional and technical personnel for docking, product quality is hard, and after-sales are guaranteed. After the one-year warranty is over, we can provide maintenance services for customers (this requires a fee).

YiHe Type T6CC

FAQ

Q: Are you trading company or manufacture?

A: We are factory

Q: How long is your delivery time?

A: Gernally it is 1-2days if the goods are in stock.It is 5-7days if the goods no stock.It is subject to order quantity.

Q: Do you provide sample,Is it free or extra?

A: We are willing to provide samples to test quality first, it is not for free because it is high value products. But sample cost can return in bulk order.

Q: What is the terms of payment?

A: 100% deposit or 30% deposit, 70% before shippment.

Q: How long is the warranty?

A: We offer 12 months warranty. 

double Vane Pump




Related Products6
Product Tag
Get the latest price? We'll respond as soon as possible(within 12 hours)